Unplanned
Notification of Unplanned Unavailability
Please be advised that the flow to the National Grid from Bacton/SEAL/St. Fergus has been reduced for an unplanned outage:
Event ID | Message Type | Facility | Time Published | Time of Event | Expected End | Actual End | Volume impact mcm/day |
---|---|---|---|---|---|---|---|
20161002SL | Final | Bacton Seal | 19:40 02/10/2016 |
06:00 02/10/2016 |
NA | 18:00 02/10/2016 |
7.5 Mcm |
2016001 | New | St Fergus | 12:00 28/12/2016 |
06:00 28/12/2016 |
Unknown | NA | 10.6 |
2016001 | Final | St Fergus | 18:30 29/12/2016 |
18:30 29/12/2016 | NA | 18:30 29/12/2016 | 15.85Mm3 total for the duration of this outage. |
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.
Planned
Notification of Planned Unavailability
Please be advised that the flow to the National Grid from Bacton/SEAL/St. Fergus will be reduced for the following planned outage:
Event ID | Message Type | Facility | Time Published | Time of Event | Expected End | Actual End | Volume impact mcm/day |
---|---|---|---|---|---|---|---|
20160208SF | Final | St Fergus | 12:00 26/11/2015 |
10:00 08/02/2016 |
22:00 08/02/2016 |
22:00 08/02/2016 |
16 mcm/day (6-12hr plant outage for ESD testing) |
20160801SL | Update | SEAL | 12:00 16/3/2016 |
06:00 03/08/2016 |
06:00 07/08/2016 |
NA | 17.5 mcm/day |
20160430BS | Final | Bacton Shell | 12:00 18/12/2015 | 06:00 01/05/2016 | 12:00 02/05/2016 |
18:00
|
15 |
20160601SF | Final | St Fergus | 12:00 9/03/2016 |
06:00 01/06/2016 |
06:00 08/06/2016 |
23:50 07/06/2016 |
7.5 mcm/day (but 50% terminal capacity reduction during single module operations) |
20160916SF | Final | St Fergus | 12:00 15/08/2016 |
06:00 16/09/2016 |
06:00 01/10/2016 |
00:01 04/10/2016 |
7.5 mcm/day (but 50% terminal capacity reduction during single module operations) |
20161002SF | New | St Fergus | 12:00 15/08/2016 |
06:00 2/10/2016 |
06:00 23/10/2016 |
NA | Approximate 2.5 mcm/day (gas processing capacity reduced due to downstream NGL restriction) |
20161002SF | Final | St Fergus | 12:00 15/08/2016 |
06:00 2/10/2016 |
06:00 23/10/2016 |
06:00 23/10/2016 |
Approximate 2.5 mcm/day (gas processing capacity reduced due to downstream NGL restriction) |