Notification of Planned Unavailability
Please be advised that the flow to National Grid from Shell Bacton will be reduced for planned maintenance:
Date of outage | Relevant ASEP | Loss of Volume (mcm/d) | Duration of outage |
---|---|---|---|
13/09/14 | Bacton | 18 | 2 days |
Please be advised that the flow to National Grid from Shell St Fergus will be reduced for planned maintenance:
Date of outage | Relevant ASEP | Loss of Volume (mcm/d) | Duration of outage |
---|---|---|---|
07/04/2014 | St Fergus | 25 | 6-12 hours |
15/08/2014 | St Fergus | 12 (capacity reduction) | Module now expected to be fully available from Monday 20th October 2014.
|
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.
Unplanned Unavailability
Please be advised that the flow to National Grid from Shell St Fergus has been reduced for an unplanned outage:
Time of outage | Relevant ASEP | Loss of Volume (mcm/d) | Anticipated duration |
---|---|---|---|
13:25 21/02/2014 | St Fergus | 11.1 | 0.5 hrs |
06:00 16/09/2014 | St Fergus | 10.41 | 10 hrs |
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.