Upstream operational information 2013
Information on the planned (maintenance) and unplanned unavailability of assets operated by Shell U.K. Limited in accordance with its obligations under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT).
Notification of Planned Unavailability
Please be advised that the flow to National Grid from Shell Bacton will be reduced for planned maintenance:
Date of outage | Relevant ASEP | Loss of Volume (mcm/d) | Duration of outage |
---|---|---|---|
6.00 am 14/09/2013 | Bacton | 17.7 | 39 hours |
Please be advised that the flow to National Grid from Shell Bacton SEAL will be reduced for planned maintenance:
Date of outage | Relevant ASEP | Loss of Volume (mcm/d) | Duration of outage |
---|---|---|---|
01/08/2013 | Bacton SEAL | 10 | 18 days |
Please be advised that the flow to National Grid from Shell St Fergus will be reduced for planned maintenance:
Date of outage | Relevant ASEP | Loss of Volume (mcm/d) | Duration of outage |
---|---|---|---|
07/05/2013 at 08:00 hrs | St Fergus | 25 | 6-12 hours |
02/09/2013 at 00:01 hrs | St Fergus | 12 (capacity reduction) | 21 days |
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.
Unplanned Unavailability
Please be advised that the flow to National Grid from Shell Bacton has been reduced for unplanned maintenance:
Time of outage | Relevant ASEP | Loss of Volume (mcm/d) | Anticipated duration |
---|---|---|---|
11:07 05/01/2013 | Bacton | 16.69 | 3.5 hrs |
01:42 05/04/2013 | Bacton | 11.05 | 0.5 hrs |
03:32 21/12/2013 | Bacton | 11.86 | 0.5 hrs |
Please be advised that the flow to National Grid from Shell St Fergus has been reduced for an unplanned outage:
Time of outage | Relevant ASEP | Loss of Volume (mcm/d) | Anticipated duration |
---|---|---|---|
14:00 07/02/2013 | St Fergus | Various changes, peak reduction at 10.3mcm/d | 18 hrs |
13:15 02/03/2013 | St Fergus | 13.0 Mm3/d | 6 hrs |
12:02 30/03/2013 | St Fergus | 11.1 Mm3/d | 2 hrs |
12:49 01/04/2013 | St Fergus | 10.1 Mm3/d | 2 hrs |
13:45 16/04/2013 | St Fergus | 10.64 Mm3/d | 1 hr |
21:45 07/07/2013 | St Fergus | 20.5 Mm3/d | 15 mins at zero, then ~1hr to get back above 10mcm/d reduction threshold. |
21:01 05/11/2013 | St Fergus | 10.25 | 2 hrs |
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.
Previous information
More in this section
North Sea operated assets
Discover more about Shell’s oil and gas operated assets in the North Sea including capacity and facilities information.
SEGAL system
The SEGAL system is made up of two wet gas transportation pipelines, the St. Fergus gas terminal, Fife NGL terminal and Braefoot Baytanker loading facility.
Published key terms
Data published in accordance with the Code of Practice on Access to Upstream Oil and Gas Infrastructure on the UK Continental Shelf (ICOP) and the Gas Act (1995).