Unplanned

Notification of Unplanned Unavailability

Please be advised that the flow to the National Grid from Bacton/SEAL/St. Fergus has been reduced for an unplanned outage:

Event ID Message Type Facility Time Published Time of Event Expected End Actual End Volume impact mcm/day
20161002SL Final Bacton Seal 19:40
02/10/2016
06:00
02/10/2016
NA 18:00
02/10/2016
7.5 Mcm
2016001 New St Fergus 12:00
28/12/2016
06:00
28/12/2016
Unknown NA 10.6
2016001 Final St Fergus 18:30
29/12/2016
18:30 29/12/2016 NA 18:30 29/12/2016 15.85Mm3 total for the duration of this outage.

The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.

Planned

Notification of Planned Unavailability

Please be advised that the flow to the National Grid from Bacton/SEAL/St. Fergus will be reduced for the following planned outage:

Event ID Message Type Facility Time Published Time of Event Expected End Actual End Volume impact mcm/day
20160208SF Final St Fergus 12:00
26/11/2015
10:00
08/02/2016
22:00
08/02/2016
22:00
08/02/2016 
16 mcm/day
(6-12hr plant outage for ESD testing)
20160801SL Update SEAL 12:00
16/3/2016
06:00
03/08/2016
06:00
07/08/2016
NA 17.5 mcm/day
20160430BS Final Bacton Shell 12:00 18/12/2015 06:00 01/05/2016 12:00 02/05/2016

 

18:00
02/05/2016

 

15 
20160601SF Final St Fergus 12:00
9/03/2016
06:00
01/06/2016
06:00
08/06/2016
23:50
07/06/2016
7.5 mcm/day (but 50% terminal capacity reduction during single module operations)
20160916SF Final St Fergus 12:00
15/08/2016
06:00
16/09/2016
06:00
01/10/2016
00:01
04/10/2016
7.5 mcm/day (but 50% terminal capacity reduction during single module operations)
20161002SF New St Fergus 12:00
15/08/2016
06:00
2/10/2016
06:00
23/10/2016
NA Approximate 2.5 mcm/day (gas processing capacity reduced due to downstream NGL restriction)
20161002SF Final St Fergus 12:00
15/08/2016
06:00
2/10/2016
06:00
23/10/2016
06:00
23/10/2016
Approximate 2.5 mcm/day (gas processing capacity reduced due to downstream NGL restriction)

The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.

More in Upstream oil and gas

North Sea operated assets

Discover more about Shell’s oil and gas operated assets in the North Sea including capacity and facilities information.

SEGAL system

The SEGAL system is made up of two wet gas transportation pipelines, the St. Fergus gas terminal, Fife NGL terminal and Braefoot Baytanker loading facility.

Published key terms

Data published in accordance with the Code of Practice on Access to Upstream Oil and Gas Infrastructure on the UK Continental Shelf (ICOP) and the Gas Act (1995).

Contracting and procurement

Documents provided by the Contracting and Procurement Management group for information and guidance on how to do business with us.