Unplanned

Notification of Unplanned Unavailability

Please be advised that the flow to the National Grid from Bacton/SEAL/St. Fergus has been reduced for an unplanned outage:

Event ID Message Type Facility Time Published Time of Event Expected End Actual End Volume impact mcm/day
2015003 New St Fergus 16:45
07/11/2015
15:45
07/11/2015
Unknown NA 10.5
2015001 New St Fergus 13:30
02/02/2015
12:30
02/02/2015
Unknown NA 12
2015001 Revision 1 St Fergus 18:00
02/02/2015
18:00
02/02/2015
Unknown NA 18
2015001 Revision 2 St Fergus 01:30
03/02/2015
01:30
03/02/2015
Unknown NA 16
2015001 Final St Fergus 13:00
04/02/2015
12:00
04/02/2015
NA 12:00
04/02/2015
16 (Actual)
2015002 New St Fergus 21:00
17/07/2015
06:00
18/07/2015
06:00
31/07/2015
NA 12.6 Mm3/d
2015002 Final St Fergus 10:00
23/07/2015
09:22
23/07/2015
NA 09:22
23/07/2015
Total 63.34 Mm3 for incident
2015003 Final St Fergus 00:40
08/11/2015
23:40
07/11/2015
NA 23:40
7/11/2015
5.0

The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.

Planned

Notification of Planned Unavailability

Please be advised that the flow to the National Grid from Bacton/SEAL/St. Fergus will be reduced for the following planned outage:

Event ID Message Type Facility Time Published Time of Event Expected End Actual End Volume impact mcm/day
20150209SF Final St Fergus 12:00
13/01/2015
10:00
09/02/2015
22:00
09/02/2015
15:15
09/02/2015
16 mcm/day
(6-12hr plant outage for ESD testing)
20150827SF Final St Fergus 12:00
28/05/2015
07:30
27/08/2015
18:00
27/08/2015
16:00 27/08/2015 Full St Fergus outage
20150912BN Final Bacton 11:00
13/01/2015 
06:00
12/09/2015 
06:00
13/09/2015 
03:00
13/09/2015 
12.9
20150801SL Final SEAL 11:00
13/01/2015
06:00
01/08/2015
06:00
06/08/2015
06:00
06/08/2015
Export capability returned
20150819SF Final St Fergus 11:00
13/01/2015
06:00
19/08/2015
06:00
01/10/2015
06:00
01/10/2015
7.5 mcm/day (but 50% terminal capacity reduction during single module operations)

The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.

More in Upstream oil and gas

North Sea operated assets

Discover more about Shell’s oil and gas operated assets in the North Sea including capacity and facilities information.

SEGAL system

The SEGAL system is made up of two wet gas transportation pipelines, the St. Fergus gas terminal, Fife NGL terminal and Braefoot Baytanker loading facility.

Published key terms

Data published in accordance with the Code of Practice on Access to Upstream Oil and Gas Infrastructure on the UK Continental Shelf (ICOP) and the Gas Act (1995).

Contracting and procurement

Documents provided by the Contracting and Procurement Management group for information and guidance on how to do business with us.